Multiplex’s decision to engage Hera Engineering to deliver a value-engineered structural steel construction methodology for Brisbane’s 300 George Street resultedin significant cost and time savings. Hera’s Matteo Tirapelle outlines the benefits steel brought to the project.

Brisbane’s 300 George Street is the latest structural steel high-rise building to be built in the Queensland capital. The 41-storey building was originally designed as a concrete structure, but capacity constraints in Brisbane’s concrete construction supply chain forced primary contractor Multiplex to consider changing the building’s frame to steel.