Home / Case Studies / Page 3

Case Studies

Filter latest by

2020

Structural steel for William Street Bridge

A long-span bridge above the future entrance of the Metro Tunnel near Melbourne’s William Street has been constructed with the use...

2019

InfraBuild Recycling: Promoting a sustainable alternative to landfill

InfraBuild Recycling and the City of Newcastle are doing their part to divert materials for re-use by the steel industry that...

2019

3D modelling of headstocks for elevated Flinders Link Project railway

Key Information The $141 million Flinders Link Project in South Australia will extend the existing Tonsley rail line to a hub...

2019

Queen’s Wharf development begins to rise in Brisbane

InfraBuild has been closely involved in foundation works for Brisbane CBD’s newest precinct, the largest construction project currently underway in Queensland. ...

2019

Reduce risk with a sustainable steel supply chain

Companies are increasingly being held accountable for choices made across their supply chains, which means trust, transparency and traceability are more...

2019

Local steel for new jetty

Work has begun on Whyalla’s new jetty, which is being built using steel supplied by InfraBuild Steel Centre and with the...

2019

Collingwood project targets sustainability kudos

InfraBuild Steel Centre (formerly LIBERTY OneSteel Metalcentre) has helped reduce lead times and minimise material waste in the construction of a...

2019

Smooth sailing for Melbourne’s newest skyscraper

Melbourne’s new Aurora Melbourne Central building isn’t just the city’s tallest residential building, it has made efficient use of materials and...

2019

Civmec’s massive shed for naval ships

Engineering firm Civmec is putting the finishing touches to a state-of-the-art undercover shipbuilding facility that will be Australia’s largest once complete....

2019

Easy flooring with DuraGal® Plus

The DuraGal® Flooring System is a fully engineered steel flooring system developed to provide a termite-resistant, economical and easy-to-install alternative to...

2019

Australia 108: Double-pronged steel supply

Melbourne’s Australia 108 building will become the country’s tallest building by roof height when completed in 2020. Steel prestressing strand and...

2019

Melbourne Metro GFRP D-Wall cages

InfraBuild is delivering the Melbourne Metro Tunnel Project with its supply and installation of Dextra ASTEC Soft-Eyes D-Wall cages. Tunnelling is set...