Speedy steel in a tight spot
Structural steel met the challenges for construction of new staff parking facilities at the Prince of Wales Hospital in Randwick, Sydney.
Faced with the constraints of building the new carpark on an entire block without obstructing the main ambulance thoroughfare, the International Parking Group in charge of the $25 million parking management contract, chose to take advantage of the construction benefits inherent in structural steel. The design was headed by Park Up, a joint venture between BHP Engineering and ABBEC.
Related Case Studies
Subscribe to the
InfraBuild newsletter
Receive regular updates on news, case studies as well as the latest products and services.