271 Spring St

Home / Processing & Fabrication 271 Spring St https://www.infrabuild.com/wp-content/uploads/sites/8/2021/04/Project-Profile-271-Spring-Street_2.m4v Key Information Steel was an essential enabler for 271 Spring St’s cantilevered design InfraBuild Steel Centre supplied universal beams, columns, and channels sourced from InfraBuild’s integrated supply chain. InfraBuild supplied over 2000 tonnes of steel to our longterm customers, GFC Industries The site on 271 Spring…

Read More

Mortlake Wind Farm

Wind turbines look like simple structures. A tower of smooth-surfaced steel rising to three blades, similar to a windmill, which spin a shaft connected to a generator, producing electricity.   For InfraBuild’s Launceston Steel Centre, however, the recent construction of 17 wind towers presented a whole set of unique and complex challenges. In partnership with…

Read More

Flinders Link Rail Project – South Australia

Home / Processing & Fabrication Flinders Link Rail Project – South Australia Key Information $141 million jointly funded railway project by the Australian and South Australian government InfraBuild Steel Centre supplied the cut plate component Liberty Primary Steel supplied plain carbon and head hardened rail, all made locally in Whyalla The importance of strong relationships…

Read More

Multiplex’s cantilevered 80 Collins Street

The structural steel frame of the 80 Collins Street building allows it to cantilever over prime Melbourne street space.    Due for completion in 2020, the 80 Collins Street building in Melbourne features a unique cantilevering design and a large floor area that projects over heritage street levels. The design of the building is being made…

Read More

Tasmania: Unique new home

All the steelwork required for the supporting frame for this unusual new home was cut to length and supplied by InfraBuild Steel Centre in Tasmania. It’s not uncommon to find shipping containers taking on new uses once they’ve finished travelling the high seas. But it’s not every day you’ll find two containers welded together and…

Read More

Cambering machine delivers efficiencies

InfraBuild Steel Centre’s new cambering machine is delivering efficiencies with pre-cambered steel beams for lighter and shallower beams in Brisbane’s latest structural steel high-rise building. Alongside the 34-storey 5-star W Hotel and 82-storey residential tower The One, the Brisbane Quarter development features a 41-storey commercial tower of 48,342sqm of A-grade office space under construction by…

Read More

Processed steel for Westfield Coomera

Processing of beams prior to fabrication was an important value-add in InfraBuild Steel Centre’s supply of structural steel to the Westfield Coomera project. This story was originally published May 2018 and updated October 2018 The new Westfield Coomera development on Queensland’s Gold Coast had its official opening last week, with the project completing on schedule.…

Read More

WestConnex: Integrated supply solution

InfraBuild has proved its value proposition to WestConnex piling contractor Wagstaff with its integrated fabrication and delivery model. A new state-of-the-art coping machine and efficient, integrated supply of steel have helped to keep a key section of Sydney’s WestConnex project on track. InfraBuild Steel Centre (formerly LIBERTY OneSteel Metalcentre) in Wetherill Park has supplied several…

Read More

Kilic Engineering breaks US grain market

Innovative engineering with Australian-made steel has positioned family-run Kilic Engineering to break into the lucrative US Midwest grain market. Kilic Engineering (KE) manufactures smart, flexible and high-capacity bulk handling equipment. With just-in-time delivery of high-quality Australian-produced Kilic Engineering (KE) manufactures smart, flexible and high-capacity bulk handling equipment. With just-in-time delivery of high-quality Australian-produced steel supplied…

Read More

Pandrol success story

InfraBuild has made huge improvements in product identification and scanning solutions recently.  InfraBuild (formerly LIBERTY), in partnership with GS1 Australia, has standardised product identification and scanning processes to improve productivity and customer quality outcomes. An example is a 10-minute reduction in truck turnaround times at the InfraBuild Sydney Bar Mill Warehouse. The project’s success is…

Read More